M10 Pendik-SGH Metro Line, Pendik-Fevzi Cakmak Phase
- • Contractor:
- Özgün İnşaat Taahhüt San. ve Tic. Ltd. Şti.
- • Date of Start:
- 28.04.2017
- • Projects:
- 2.896.691.026,14 ₺ + KDV
The line covers M10 Pendik-Sabiha Gokcen Airport metro line between Pendik Merkez and Fevzi Cakmak-Hastane.
Integrated Lines
The line will be integrated with
The line will be integrated with Pendik station of Marmaray line and High-Speed Rail lines, along with Kaynarca Merkez Station of M4 Kadikoy-Tuzla metro line.